|
Industry: Electronics/Semiconductor/IC Intel Flash Engineering Department Individual Contributor
Responsibilities:
I have been working in Intel Flash Assembly & Test Engineering
Department as an Individual Contributor since June of 20xx.
Being Leader of ATE Yield team, I have been working with the team members to improve the products yield. Our efforts are paid off:
-
The yield of year 20xxhas been dramatically increased than that of year 20xx.
-
The yield of all products, consecutively meets the goal.
-
The total amount of cost saving due to yield improvement is more than class="con">
英文简历是求职者自我推销的必备文件。那你知道该怎么制作自己的英文简历吗?下面是学习啦小编为大家带来的英文表格简历模板,相信对你会有帮助的。
英文表格简历模板(一)
Name |
xuexila |
|
Gender |
Female |
Date of Birth |
|
Location |
|
Contact No |
|
Address |
|
E-mail |
xuexila.com |
Job Target
Target Industry |
The hope responds to a call for recruits profession scope |
Target job |
The hope responds to a call for recruits post |
Target address |
Hope work area, urban scope |
Target salary |
Anticipation wage level welfare demand,Discussing in person |
To hillock time |
The new post can in the long time assume the post |
Working Experience
1995/08—2002/02 |
XXX |
|
Industry: Apparel/Textiles/Leather Goods
Administrative Department Admin Manager/Supervisor/Office Manager
1995/08—1997/08 Clerk Administrative Dept.
To distribute the government documents; sort out and file the company documents; recruit; receive the visitor.
1997/09—2002/02 Vice officer. Officer in Administrative Dept, Secretary of General Manager
-
To manage the central file, contact with the government;
-
Familiar with the register of enterprise, register of label etc;
-
Assist the General Manager to correspond with every department and receive the important visitor and customers.
-
To compile ISO9000 procedure manual and quality manual, manage and internal audit (Got the Internal Auditor certificate)
2002/07—Now Shanghai Web International Training Centre Study English |
Education/Training
1991/09—1995/07 |
Dalian Light Industry Institute Food Sciences Bachelor |
2001/03—2001/04 |
China Quality Certification Centre For Import And Export CommoditiesISO9001:2000 standard internal auditor training |
2000/04—2000/04 |
China Quality Certification Centre For Import And Export CommoditiesISO9002:1994 standard internal auditor training |
Certificate
2001/04 |
ISO9001:2000 standard internal auditor certificate |
1993/07 |
CET4 |
Self-appraisal
Optimistic; Self-motivated; Strong responsibility; Good interpersonal and communication;Be able to work under great pressure; Team work spirit. Good computer skills in MS Window, MS Office. |
英文表格简历模板(二)
Name:xuexila |
Hukou:Shanghai |
Residency:Shanghai |
Work Experience: |
Current Salary: |
Tel: |
E-mail:xuexila.com |
Career Objective |
Desired Industry: |
Electronics/Semiconductor/IC ,Science/Research ,Government ,Others ,Testing, Certification |
Desired Position: |
Senior Hardware Engineer ,Semiconductor Technology, Branch Office Manager ,Chief Representative ,Research Specialist Staff |
Desired address: |
Shanghai ,Hongkong ,Beijing ,Taiwan ,Macao |
Desired Salary: |
Negotiable |
Work Experience |
20xx/06—Present |
***Company |
|
Industry: Electronics/Semiconductor/IC
Intel Flash Engineering Department Individual Contributor
Responsibilities:
I have been working in Intel Flash Assembly & Test Engineering
Department as an Individual Contributor since June of 20xx.
Being Leader of ATE Yield team, I have been working with the team members to improve the products yield. Our efforts are paid off:
-
The yield of year 20xx has been dramatically increased than that of year 20xx.
-
The yield of all products, consecutively meets the goal.
-
The total amount of cost saving due to yield improvement is more than $1 million compared with year 20xx. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 20xx.
Report Directly to: Department ManagerNumber of Subordinate: 14
Reference: Bao Powel
Achievements: Being Leader of ATE Yield team, I have been working with the team members to improve the products yield.
Our efforts are paid off:
-
The yield of year 20xx has been dramatically increased than that of year 20xx.
-
The yield of all products, consecutively meets the goal.
-
The total amount of cost saving due to yield improvement is more than $1 million compared with year 20xx. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 20xx.
|
20xx/01—20xx/05 |
Intel(Shanghai) Technology Development Ltd.Company |
|
Industry: Electronics/Semiconductor/IC
Intel STTD-China Department Electronics Development Engineer
Responsibilities:
-
I had been working in STTD-China since Jan 20xx to May 20xx as a senior module engineer.
-
At that time, as a main contributor of this project, we succeeded in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one time.
Report Directly to: Hopman Mark Number of Subordinate: 14
Reference: Bao Powel
Reason for Leaving: I was transferred to Intel(Shanghai)Products Ltd. Company due to the internal re-organization in June of 20xx.
Achievements: As a main contributor of STTD-China department, I co-work with my colleagues to succeed in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one cycle. |
20xx/05—20xx/01 |
Nanyang University of Science & Technology |
|
Industry: Electronics/Semiconductor/IC
Electronics & Electrical Engineering Department Research Fellow
Responsibilities:
-
I work in Electronics & Electrical Engineering Department of Nanyang University of Science & Technology as a Research Fellow.
-
I majored at Gate Oxide Reliability Research in the duration.
Report Directly to: Professor Pey Kin Leoh
Subordinate: 3
Reference: Patrick Low
Reason for Leaving: I completed the project which I undertook by myself, and want to do more challenging job.
Achievements: In less than one year, I made a lot of experiments and acquired the wonderful data for the project by myself. |
Project Experience |
20xx/01—Present |
Assembly NPI (New Product Introduction) |
|
Project Description: To introduce more products into Intel Flash Assembly factory, I join Assembly NPI team and work as the team leader. I coordinate with IE, Planner, Marketing guy and Engineer to select new product items, do demo in factory, and then qualify it.
Responsibility: I am working as NPI Team leader and coordinate all team members, define the NPI candidate, make Assembly build plan, follow up the progress. |
20xx/01—20xx/12 |
Marginal Electrical Boards Rescue |
|
Project Description: To rescue some electrical boards of testing equipment, a Task Force team was built up and led by me. We categorized each kind of board, made historical failure analysis on each kind of board and around &2.5 million dollars was saved finally.
Responsibility: Being the team leader, I took the job of data analysis, define each member's role, make program plan, coordinate each team member and follow up the progress. |
20xx/10—20xx/05 |
Optimization the current Test Process Order for Flash Memory |
|
Project Description: To simplify the current Test procedure and enhance the working efficiency, a Task Force team has been called and started by me.
Responsibility: Being the Project leader, I take the main responsibility, such as, design, plan, organize and implement. |
20xx/05—20xx/12 |
Test Yield of Flash memory Improvement |
|
Project Description: To improve the test yield of different products, a Task Force team was built up and led by me. Being the team leader, I worked with all team members to dig out the failure root cause for each product, defined action taken plan for each emergency case, coordinated each team member and make pro-active plan to avoided unexpected things happen.
Responsibility: Being the team leader of Improving Test Yield, coordinate each team member, make program plan and follow up. |
Education and Training |
20xx/05—20xx/01 |
Nanyang University of Science & Technology Microelectronics Doctorate |
|
I worked in Nan yang University of Science & Technology as a Research Fellow. I major at Gate oxide Reliability research in the duration. |
20xx/03—20xx/03 |
Seoul National University of Korea Microelectronics Others |
|
I had been working in National Physical Lab of Seoul National University in Korea since March of 20xx to March of 20xx as a Post-doctor. Where I unhook the project of research & development of Carbon-Nan tube Biosensor. And only after one year, an EIS sensor based on CMOS technology has been successfully produced. And one SCI paper about it has been published in Semiconductor Science and Technology. |
20xx/03—20xx/03 |
Shanghai Institute of Microsystems and Information Technology,Chinese Academy of Sciences Information Technology Doctorate |
20xx/09—20xx/03 |
Nanjing University of Science & Technology Material Science and Engineering Master |
|
Being a master student of this period, I have published one EI paper about Super-fine metal power's electrical characteristics. |
20xx/09—20xx/07 |
Nanjing University of Science & Technology Material Science and Engineering Bachelor |
20xx/07—20xx/07 |
Assistant Engineer in Quality Verification Department, Boiler Factory in Zhengzhou city of Henan resistant Engineer in Quality Verification Department |
Professional Skills |
Language Skills: |
English: EXCELLENT
Korean: AVERAGE |
Computer Skills: |
Technology skilled 96Month
SAP understanding 8Month |
Certificate: |
20xx/11 MCSE
20xx/06 CET6 |
Self-appraisal |
7 years working experience of Semiconductor Industry and where 2 years overseas working/study experience. Smart working, innovation thinking and very talented creative working model. |
.5M in 20xx.
Report Directly to: Department ManagerNumber of Subordinate: 14
Reference: Bao Powel
Achievements: Being Leader of ATE Yield team, I have been working with the team members to improve the products yield.
Our efforts are paid off: -
The yield of year 20xxhas been dramatically increased than that of year 20xx.
-
The yield of all products, consecutively meets the goal.
-
The total amount of cost saving due to yield improvement is more than class="con">
英文简历是求职者自我推销的必备文件。那你知道该怎么制作自己的英文简历吗?下面是学习啦小编为大家带来的英文表格简历模板,相信对你会有帮助的。
英文表格简历模板(一)
Name |
xuexila |
|
Gender |
Female |
Date of Birth |
|
Location |
|
Contact No |
|
Address |
|
E-mail |
xuexila.com |
Job Target
Target Industry |
The hope responds to a call for recruits profession scope |
Target job |
The hope responds to a call for recruits post |
Target address |
Hope work area, urban scope |
Target salary |
Anticipation wage level welfare demand,Discussing in person |
To hillock time |
The new post can in the long time assume the post |
Working Experience
1995/08—2002/02 |
XXX |
|
Industry: Apparel/Textiles/Leather Goods
Administrative Department Admin Manager/Supervisor/Office Manager
1995/08—1997/08 Clerk Administrative Dept.
To distribute the government documents; sort out and file the company documents; recruit; receive the visitor.
1997/09—2002/02 Vice officer. Officer in Administrative Dept, Secretary of General Manager
-
To manage the central file, contact with the government;
-
Familiar with the register of enterprise, register of label etc;
-
Assist the General Manager to correspond with every department and receive the important visitor and customers.
-
To compile ISO9000 procedure manual and quality manual, manage and internal audit (Got the Internal Auditor certificate)
2002/07—Now Shanghai Web International Training Centre Study English |
Education/Training
1991/09—1995/07 |
Dalian Light Industry Institute Food Sciences Bachelor |
2001/03—2001/04 |
China Quality Certification Centre For Import And Export CommoditiesISO9001:2000 standard internal auditor training |
2000/04—2000/04 |
China Quality Certification Centre For Import And Export CommoditiesISO9002:1994 standard internal auditor training |
Certificate
2001/04 |
ISO9001:2000 standard internal auditor certificate |
1993/07 |
CET4 |
Self-appraisal
Optimistic; Self-motivated; Strong responsibility; Good interpersonal and communication;Be able to work under great pressure; Team work spirit. Good computer skills in MS Window, MS Office. |
英文表格简历模板(二)
Name:xuexila |
Hukou:Shanghai |
Residency:Shanghai |
Work Experience: |
Current Salary: |
Tel: |
E-mail:xuexila.com |
Career Objective |
Desired Industry: |
Electronics/Semiconductor/IC ,Science/Research ,Government ,Others ,Testing, Certification |
Desired Position: |
Senior Hardware Engineer ,Semiconductor Technology, Branch Office Manager ,Chief Representative ,Research Specialist Staff |
Desired address: |
Shanghai ,Hongkong ,Beijing ,Taiwan ,Macao |
Desired Salary: |
Negotiable |
Work Experience |
20xx/06—Present |
***Company |
|
Industry: Electronics/Semiconductor/IC
Intel Flash Engineering Department Individual Contributor
Responsibilities:
I have been working in Intel Flash Assembly & Test Engineering
Department as an Individual Contributor since June of 20xx.
Being Leader of ATE Yield team, I have been working with the team members to improve the products yield. Our efforts are paid off:
-
The yield of year 20xx has been dramatically increased than that of year 20xx.
-
The yield of all products, consecutively meets the goal.
-
The total amount of cost saving due to yield improvement is more than $1 million compared with year 20xx. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 20xx.
Report Directly to: Department ManagerNumber of Subordinate: 14
Reference: Bao Powel
Achievements: Being Leader of ATE Yield team, I have been working with the team members to improve the products yield.
Our efforts are paid off:
-
The yield of year 20xx has been dramatically increased than that of year 20xx.
-
The yield of all products, consecutively meets the goal.
-
The total amount of cost saving due to yield improvement is more than $1 million compared with year 20xx. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 20xx.
|
20xx/01—20xx/05 |
Intel(Shanghai) Technology Development Ltd.Company |
|
Industry: Electronics/Semiconductor/IC
Intel STTD-China Department Electronics Development Engineer
Responsibilities:
-
I had been working in STTD-China since Jan 20xx to May 20xx as a senior module engineer.
-
At that time, as a main contributor of this project, we succeeded in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one time.
Report Directly to: Hopman Mark Number of Subordinate: 14
Reference: Bao Powel
Reason for Leaving: I was transferred to Intel(Shanghai)Products Ltd. Company due to the internal re-organization in June of 20xx.
Achievements: As a main contributor of STTD-China department, I co-work with my colleagues to succeed in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one cycle. |
20xx/05—20xx/01 |
Nanyang University of Science & Technology |
|
Industry: Electronics/Semiconductor/IC
Electronics & Electrical Engineering Department Research Fellow
Responsibilities:
-
I work in Electronics & Electrical Engineering Department of Nanyang University of Science & Technology as a Research Fellow.
-
I majored at Gate Oxide Reliability Research in the duration.
Report Directly to: Professor Pey Kin Leoh
Subordinate: 3
Reference: Patrick Low
Reason for Leaving: I completed the project which I undertook by myself, and want to do more challenging job.
Achievements: In less than one year, I made a lot of experiments and acquired the wonderful data for the project by myself. |
Project Experience |
20xx/01—Present |
Assembly NPI (New Product Introduction) |
|
Project Description: To introduce more products into Intel Flash Assembly factory, I join Assembly NPI team and work as the team leader. I coordinate with IE, Planner, Marketing guy and Engineer to select new product items, do demo in factory, and then qualify it.
Responsibility: I am working as NPI Team leader and coordinate all team members, define the NPI candidate, make Assembly build plan, follow up the progress. |
20xx/01—20xx/12 |
Marginal Electrical Boards Rescue |
|
Project Description: To rescue some electrical boards of testing equipment, a Task Force team was built up and led by me. We categorized each kind of board, made historical failure analysis on each kind of board and around &2.5 million dollars was saved finally.
Responsibility: Being the team leader, I took the job of data analysis, define each member's role, make program plan, coordinate each team member and follow up the progress. |
20xx/10—20xx/05 |
Optimization the current Test Process Order for Flash Memory |
|
Project Description: To simplify the current Test procedure and enhance the working efficiency, a Task Force team has been called and started by me.
Responsibility: Being the Project leader, I take the main responsibility, such as, design, plan, organize and implement. |
20xx/05—20xx/12 |
Test Yield of Flash memory Improvement |
|
Project Description: To improve the test yield of different products, a Task Force team was built up and led by me. Being the team leader, I worked with all team members to dig out the failure root cause for each product, defined action taken plan for each emergency case, coordinated each team member and make pro-active plan to avoided unexpected things happen.
Responsibility: Being the team leader of Improving Test Yield, coordinate each team member, make program plan and follow up. |
Education and Training |
20xx/05—20xx/01 |
Nanyang University of Science & Technology Microelectronics Doctorate |
|
I worked in Nan yang University of Science & Technology as a Research Fellow. I major at Gate oxide Reliability research in the duration. |
20xx/03—20xx/03 |
Seoul National University of Korea Microelectronics Others |
|
I had been working in National Physical Lab of Seoul National University in Korea since March of 20xx to March of 20xx as a Post-doctor. Where I unhook the project of research & development of Carbon-Nan tube Biosensor. And only after one year, an EIS sensor based on CMOS technology has been successfully produced. And one SCI paper about it has been published in Semiconductor Science and Technology. |
20xx/03—20xx/03 |
Shanghai Institute of Microsystems and Information Technology,Chinese Academy of Sciences Information Technology Doctorate |
20xx/09—20xx/03 |
Nanjing University of Science & Technology Material Science and Engineering Master |
|
Being a master student of this period, I have published one EI paper about Super-fine metal power's electrical characteristics. |
20xx/09—20xx/07 |
Nanjing University of Science & Technology Material Science and Engineering Bachelor |
20xx/07—20xx/07 |
Assistant Engineer in Quality Verification Department, Boiler Factory in Zhengzhou city of Henan resistant Engineer in Quality Verification Department |
Professional Skills |
Language Skills: |
English: EXCELLENT
Korean: AVERAGE |
Computer Skills: |
Technology skilled 96Month
SAP understanding 8Month |
Certificate: |
20xx/11 MCSE
20xx/06 CET6 |
Self-appraisal |
7 years working experience of Semiconductor Industry and where 2 years overseas working/study experience. Smart working, innovation thinking and very talented creative working model. |
.5M in 20xx.
|